What's new

Air Shammee vs Air Shammee II

Etowah

Martins

Active member
Joined
Oct 10, 2020
Messages
173
Reaction score
99
Points
28
Things are moving pretty quick for me at the wash getting things updated and looking nice! next set is paint then i want to install some in bay dryers. ive looked a little bit on here but couldn't find a dedicated thread about the 2 systems and which you prefer. i know alot are with the original due to the ease and cost of replacing the blowers etc. but what im curious on is which system performs better. on the II attic mount or wall mount? (though i know its 3 phase). or is the performance difference minimal? i see the I is slightly cheaper but want your feedback on those that have them.

Thanks all!
 
Last edited:

Greg Pack

Wash Weenie
Joined
Sep 3, 2007
Messages
4,388
Reaction score
2,167
Points
113
Location
Hoover, Alabama
I don't think there is a big performance difference, mainly a lower maintenance advantage as a three phase motor usually works for thousands of hours without issue.
 

tdlconceptsllc

Well-known member
Joined
Jul 30, 2013
Messages
1,060
Reaction score
427
Points
83
Location
NC
1 thing to consider which is highly over looked is the panel to make sure you have enough spare breakers. The single phase requires 2 double pole 20s or 30s cant remember off top of my head. 3 phase will pull less amps
 

OurTown

Well-known member
Joined
Nov 8, 2017
Messages
3,624
Reaction score
1,405
Points
113
Location
Ohio
The three phase motor is quieter than the triple vac motor type if installed in bay. IIRC the three phase motor is supposed to be 10% more powerful. Also the three phase type will each need at minimum a contactor (they do not ship with one) but a motor starter might be better because you can fine tune the motor protection.
 

MEP001

Well-known member
Joined
Aug 30, 2007
Messages
16,665
Reaction score
3,946
Points
113
Location
Texas
a motor starter might be better because you can fine tune the motor protection.
A motor starter for a 3-phase motor is definitely better, otherwise if you lose a leg the motor will just hum without turning until it burns up.
 

Roz

Well-known member
Joined
Oct 29, 2017
Messages
1,334
Reaction score
763
Points
113
We own both the attic and the wall system at our washes (3 phase versions using the pump breakers as mentioned above). Started with attic version thinking that the motor heat could be beneficial in the winter (not the case). Harder to service the motors inside the standup attic. The wall mounted unit is easier and quicker to service as the attic version takes more time and effort to reach for service. We will only install the wall mounted system in the future.
 

Martins

Active member
Joined
Oct 10, 2020
Messages
173
Reaction score
99
Points
28
We own both the attic and the wall system at our washes (3 phase versions using the pump breakers as mentioned above). Started with attic version thinking that the motor heat could be beneficial in the winter (not the case). Harder to service the motors inside the standup attic. The wall mounted unit is easier and quicker to service as the attic version takes more time and effort to reach for service. We will only install the wall mounted system in the future.
Did you go with the single motor wall mount or the 3 motor setup?
 

Roz

Well-known member
Joined
Oct 29, 2017
Messages
1,334
Reaction score
763
Points
113
3 motor for both to have redundancy in case a motor dies.
 

Mr. Clean

Member
Joined
Oct 9, 2007
Messages
294
Reaction score
21
Points
18
Location
Central NY
Ours are mounted in the attic - warmer, dryer air source and less clutter on the bay walls. So far, so good.
 

STXCW

Active member
Joined
Jan 15, 2020
Messages
206
Reaction score
145
Points
43
We have quite a few of the 3 phase models and they have worked flawlessly. Mounted them in the equipment room and ran PVC out to the bays
 

tdlconceptsllc

Well-known member
Joined
Jul 30, 2013
Messages
1,060
Reaction score
427
Points
83
Location
NC
I connected mine to the breakers for my pumps. Can't run both at the same time, so worked out great.
Are you guys tieing them in the breakers inside the main panel box so it will be the ss pump wires and the air dryer wires under each breaker correct? that's pretty smart free up some space. I just wanted to make sure i am understanding correctly. thanks
 

slash007

Well-known member
Joined
Jul 8, 2012
Messages
2,478
Reaction score
415
Points
83
Location
Lexington, Ky.
Are you guys tieing them in the breakers inside the main panel box so it will be the ss pump wires and the air dryer wires under each breaker correct? that's pretty smart free up some space. I just wanted to make sure i am understanding correctly. thanks
Yep. Wired to the same breakers. 2 wires going into each leg.
 

David Rolf

Active member
Joined
Sep 24, 2019
Messages
144
Reaction score
99
Points
28
Location
Oregon
I just completed my installation of 4 ea 3 phase units. I thought about tieing them into my pumps but after I looked we had plenty of space in my panels. Plus I feel better each circuit is on its own. My deciding factor on the 3 phase was did I want to add 12 more pumps to the wash or only 4? Plus after I tried several washes that used the 3 motor setup the 3 phase seems to blow harder with the Air Logic nozzles. So far customers have been using them and happy with the install. However, I'm glad it's over now as it was time-consuming!!!
 

Rfreeman

Well-known member
Joined
Aug 4, 2014
Messages
761
Reaction score
439
Points
63
Location
Ft. Worth
We have quite a few of the 3 phase models and they have worked flawlessly. Mounted them in the equipment room and ran PVC out to the bays
Did you mount the blowers in the ER? If so how well do they work having to blow all the way to the bay? Any pics of your setup?
 

Car_Wash_Guy

Well-known member
Joined
Apr 6, 2015
Messages
1,175
Reaction score
347
Points
83
Location
out west
I just completed my installation of 4 ea 3 phase units. I thought about tieing them into my pumps but after I looked we had plenty of space in my panels. Plus I feel better each circuit is on its own. My deciding factor on the 3 phase was did I want to add 12 more pumps to the wash or only 4? Plus after I tried several washes that used the 3 motor setup the 3 phase seems to blow harder with the Air Logic nozzles. So far customers have been using them and happy with the install. However, I'm glad it's over now as it was time-consuming!!!
Are you saying the install was time consuming?
 

David Rolf

Active member
Joined
Sep 24, 2019
Messages
144
Reaction score
99
Points
28
Location
Oregon
No the overall process at least for me. The parts took forever to get here then the electrician, permits, and two bad pumps out of the box. For someone full-time onsite it wouldn't be so bad.
 

mjwalsh

6 bay SS w/laundromat
Joined
Sep 7, 2007
Messages
3,134
Reaction score
173
Points
63
Location
North Dakota
We have quite a few of the 3 phase models and they have worked flawlessly. Mounted them in the equipment room and ran PVC out to the bays
I also besides Rfreeman would like to see pics if possible!

HOW FAR TO YOUR FARTHEST BAY???

This is something we might consider on a possible future redo. We would have to sometimes pass the PVC through minus 0° F cold air so we would probably insulate the 2" or larger PVC pipe. Intake air would tend to be very dry & over 60° F.

I wonder how much volume-pressure drop would happen if I ran the PVC 60 feet which we would have to do for our farthest bay???
 
Top