Hi guys, first timer here but did some research. My plan is for 2-3 bay touchless car wash in a small community (under 15k) in Arizona. The location will be on a highway (45 mph speed limit in the section). The AADT is about 10,000 (cars per day). The location is right on the highway. There is a hardware store near by, a car mechanic (small private shop), and a grocery store (small chain).
land is about 200k (6000+ feet of buildable space)
There are no other automatic car washes in a 30 miles radius.
My questions:
- from what I see here it’s wiser to hire a turnkey contractor who’ve done this before. What do you think the cost would be to build from ground up plus equipment etc? (Land excluded) is it close to 100-150k?
- is it safe to assume capture rate of 0.3% - 0.5%? 30-50 washes per day?
- is it safe to assume chemical cost of $2/car, maintenance $1500/month, electrical and utility $3000/month? Or is that too low? Too high?
- based on above + mortgage for the land, is it safe to assume 20% margin?
Thanks
land is about 200k (6000+ feet of buildable space)
There are no other automatic car washes in a 30 miles radius.
My questions:
- from what I see here it’s wiser to hire a turnkey contractor who’ve done this before. What do you think the cost would be to build from ground up plus equipment etc? (Land excluded) is it close to 100-150k?
- is it safe to assume capture rate of 0.3% - 0.5%? 30-50 washes per day?
- is it safe to assume chemical cost of $2/car, maintenance $1500/month, electrical and utility $3000/month? Or is that too low? Too high?
- based on above + mortgage for the land, is it safe to assume 20% margin?
Thanks