100% Had an issue at a wash and the GC and Union Subs were clueless. Used Thinwall for electrical where it should have been heavy wall., put electricl disconnects where water was being dumped on them,, spec'd Drywall for the tunnel, (caught that one) didn't know spec's for a required Break...