What's new

IDX MX8 and MX10

MEP001

Well-known member
Joined
Aug 30, 2007
Messages
16,665
Reaction score
3,948
Points
113
Location
Texas
If I'm not mistaken, the MX-10 has a delay start/delay stop, the MX-8 doesn't.
 

Randy

Well-known member
Joined
Sep 5, 2007
Messages
5,913
Reaction score
2,297
Points
113
The MX-8 has a 2 Second Delay On and Off

The MX-9 has No Delay

The MX-10 has a One Second Delay On and Off
 

Twodose

Active member
Joined
Sep 10, 2007
Messages
657
Reaction score
86
Points
28
Location
NE Pennsylvania
Do these act as a 24v or 120v relay for the LP functions?

And is there a hot and common terminal for each bay? I can't tell by looking at the picture and the IDX website says Under Construction, so I can't get any information from there.

Thanks:)
 

Greg Pack

Wash Weenie
Joined
Sep 3, 2007
Messages
4,430
Reaction score
2,244
Points
113
Location
Hoover, Alabama
Yes they are essentially a single pole relay, powered by 24VAC. IIRC common from each bay goes to the little connections 24 V hot goes to one of the big terminal. I think all bays have to derive 24V power from the same source. They are commonly used to power procons, or other electric pumps. They have a 20 amp max rating, but if the motor shorts it will take it out. I have fused the output in the past, I prefer to use them to power contactors.
 
Last edited:
Top