Waxman
Super Moderator
It was time to replace the 4 carriage wheels on my Side Trac 700 today. They are what the trolley assy. rides on as it goes in and out. Figured; it's snowing like crazy, time to get it done.
We started tearing the machine apart at 9am and finished around 3:30. After some testing and tweaking, all systems appear a 'go'. We also replaced a bulb in my in-bay sign; 10 screws to replace a flippin light bulb!
After a quick coffee break we're replacing a swivel in SS bay #2. Then I'm gonna slip slide on home and rest!
We started tearing the machine apart at 9am and finished around 3:30. After some testing and tweaking, all systems appear a 'go'. We also replaced a bulb in my in-bay sign; 10 screws to replace a flippin light bulb!
After a quick coffee break we're replacing a swivel in SS bay #2. Then I'm gonna slip slide on home and rest!