Have everything set (I think) to switch my self serve existing crap to a compact 5 bay high and low pressure with mixing stands. Will free up floor space and get two hugh mixing tanks off the wall. feng shway as mu wife says. Don't care what anyone says, but you step into an equipment room and everything is neat and makes sense, operators know it. Whole changeover should take 4 days.