How many inches would you leave between foam brush/triple foam units and ceiling? I want to get them as high as possible but still leave room if I have to work on it.
After a while wall space becomes premium real estate inside an equipment room. I recently saw someone run unistrut out from the wall 90 degrees and mount solenoid banks, etc. on it. Not a bad idea.
After a while wall space becomes premium real estate inside an equipment room. I recently saw someone run unistrut out from the wall 90 degrees and mount solenoid banks, etc. on it. Not a bad idea.
Can you imagine having some large disconnect for everything on a solenoid board so you could just unplug it and pull it out like a card in a PC? Sure would make servicing easier, and you could have a spare to swap out.
Can you imagine having some large disconnect for everything on a solenoid board so you could just unplug it and pull it out like a card in a PC? Sure would make servicing easier, and you could have a spare to swap out.
That would be sweet. I would just settle for a "plug and play" solenoid valve. Those single manifold blocks of solenoids are compact and nice but if you need to repair/replace one you must shut down everything and then it is not always a picnic to remove/replace the valve.