Thank you!I have a 5 bay system with cat 310s. My unloaders dump back into the supply lines.
1 of my 5 pumps are 21 years old and have never been rebuilt or replaced. The other 4 have failed seals and or valves replaced once or more, due to starving supply water for various reasons such as failed solenoids etc.
My point is these have been really reliable for me.
I will take a pic of how mine are piped and post it for you.
I run the bays at 1150-1200 psi.
Now, That is one nice equipment room.
Thank you! After you posted that I remembered reading a post sometime back that recommended not using the manifold as a pass through. In my scenario could I just add a tee to the left inlet on the pump and move the return from the unloader to the tee?I would advise against having the regulator fully on the opposite side of the inlet and/or outlet. Every time the trigger is pulled or released, the flow has to change direction in the pump, and it can cause a very brief cavitation which can destroy the manifold. It doesn't always cause a problem, things like water temperature and water quality can make it a real problem. I've known operators who were replacing manifolds every two years.