Red Baron
Active member
I'm converting my open-top SS bay to a 2nd IBA. The hoses will need to run through the attic above 2 SS bays. Should I thread the hydraulic hoses through PVC where they run above the SS bays just in case I blow a hose? I can envision a big problem if I blow a hyd hose and fluid dripped for days into a SS bay and/or onto a customer. Having the hyd hose sleeved would force any hyd fluid to drip out at the ends where I can control it.
Thoughts?
Thoughts?