Bubbles Galore
Active member
I am plumbing my new spot free membranes and MEP had mentioned that plumbing the reject to get recirculated back through the membranes would help to extend membrane life along with reducing the amount of reject.
Any ideas how to plumb this? My system is going to have a 1.5 hp booster pump pumping water through (1) 2" membrane and (2) 4" membranes.
Thanks!
Any ideas how to plumb this? My system is going to have a 1.5 hp booster pump pumping water through (1) 2" membrane and (2) 4" membranes.
Thanks!