cleaning up mud
Member
Instead of putting up panels, have you checked into the wall paint Kleen rite sells? If anyone has an input let me know, I need to do something at one of our sites.
Hi Cleaning-up-mud,Instead of putting up panels, have you checked into the wall paint Kleen rite sells? If anyone has an input let me know, I need to do something at one of our sites.
The last wash I did, I took 12 ft. sheets cut them in half and run a 16 in red band of pvc across the top from one end of the bay to the other. On the end walls and the equipt. room walls I laid to 12 ft. panels on their side across the top of the red band to keep a cleaner look and not have so many divider strips. QUOTE]
Where did you get the 16" red PVC?
Cut the 12' sheets in half so they were 4x6 or 3x12?
We always just lay the stack Horizontaly on a pallet and drill all the 3/8" holes thru all panels at the same time.I'm sure some people read the thread and though you can't drill a hole with the smooth taper of a drill bit. You can in FRP. I've drilled hundreds of them.