What's new
Car Wash Forum

This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

How many cars do you guys wash a day?

NeutralNoBrakes

New member
Hello,
We hit around 600-800 on good days, especially weekends. On slow days, we see around 200-300.
What kind of numbers do you guys see at your washes?
 
I've been involved with sites that do the kind of volume you describe as well as sites that do twice the volume you are describing.
 
Out of our 11 hour days:

On a good day? 600 - 800

On a rainy day? (which has been almost every day in Florida right now) 150 - 250

Note that we also run a multiple person prep area pre-tunnel and a hand dryer at the end, don't get them in and out as fast as some.
 
Sorry for late response. On most days, each location will wash approximately 300 to 500 cars. Our record at one location is 1,079 cars in 16 hours. We are running two belt conveyors and one chain conveyor.
 
Sorry for late response. On most days, each location will wash approximately 300 to 500 cars. Our record at one location is 1,079 cars in 16 hours. We are running two belt conveyors and one chain conveyor.
What was the cost difference between having a belt conveyer or the chain type conveyer? Assuming you had your washes built. I understand the conveyor belt is more expensive, but have also heard that you save money in concrete by the reduced dimensions of the conveyor pit.
 
What was the cost difference between having a belt conveyer or the chain type conveyer? Assuming you had your washes built. I understand the conveyor belt is more expensive, but have also heard that you save money in concrete by the reduced dimensions of the conveyor pit.
I don’t know the price difference because I have never had a belt, but I know a few operators who have had the belts removed and gone to traditional conveyors. One is Tom Hoffman of Hoffman Car Wash.
 
What was the cost difference between having a belt conveyer or the chain type conveyer? Assuming you had your washes built. I understand the conveyor belt is more expensive, but have also heard that you save money in concrete by the reduced dimensions of the conveyor pit.

Belts cost 3X what an over/under conveyor will cost.

The pit for a belt is much larger than an over/under conveyor, while there may be some "cost reduction" in the volume of concrete needed, the added dimensions for the conveyor and additional forming that is needed, will likely offset any "cost savings" from using less concrete.

Pictures below are of an over/under that was converted to a belt.
 

Attachments

  • 96712295_10157668264734332_3393488862121558016_o.jpg
    96712295_10157668264734332_3393488862121558016_o.jpg
    110.1 KB · Views: 72
  • 99424012_10157692928159332_589619398227001344_o.jpg
    99424012_10157692928159332_589619398227001344_o.jpg
    124 KB · Views: 63
  • 98342781_10157668267014332_6060614633260056576_o.jpg
    98342781_10157668267014332_6060614633260056576_o.jpg
    219.4 KB · Views: 67
  • 98176094_10157692926599332_1714567110820102144_o.jpg
    98176094_10157692926599332_1714567110820102144_o.jpg
    130.2 KB · Views: 67
  • 98170649_10157668265904332_886199173622267904_o.jpg
    98170649_10157668265904332_886199173622267904_o.jpg
    163.2 KB · Views: 67
  • 97270434_10157668266894332_7790194862392868864_o.jpg
    97270434_10157668266894332_7790194862392868864_o.jpg
    199.9 KB · Views: 70
  • 100053785_10157692926074332_5911195255062921216_o.jpg
    100053785_10157692926074332_5911195255062921216_o.jpg
    201.3 KB · Views: 61
  • 100088690_10157692925949332_8824525959110590464_o.jpg
    100088690_10157692925949332_8824525959110590464_o.jpg
    101.9 KB · Views: 65
  • 100863249_10157692928059332_2513540498002542592_o.jpg
    100863249_10157692928059332_2513540498002542592_o.jpg
    151.1 KB · Views: 67
  • 101223994_10157692926584332_4579238760276819968_o.jpg
    101223994_10157692926584332_4579238760276819968_o.jpg
    131.6 KB · Views: 66
Belts cost 3X what an over/under conveyor will cost.

The pit for a belt is much larger than an over/under conveyor, while there may be some "cost reduction" in the volume of concrete needed, the added dimensions for the conveyor and additional forming that is needed, will likely offset any "cost savings" from using less concrete.

Pictures below are of an over/under that was converted to a belt.
I could see the cost of retrofitting being higher, but I suspect those numbers would be much more reasonable if it were planned during the build. The pit is wide but appears to be very shallow. I've also read that the belt conveyor may very well become necessary as these newer vehicles utilize these advanced braking features.
 
Cost of a belt and install is 3X the cost of a standard conveyor, whether it's a new build or retro-fit, the concrete work cost is outside of the cost for the conveyor or belt.

Belts have their pluses and minuses, advanced braking systems are a challenge, however, belts have a challenge when it comes to wheel cleaning and tire shine. Without the wheel rotating doing both of these things is a challenge with a belt.
 
I’m sure they are out there but out of the dozen or so operators I’ve spoken to with belts non have really endorsed it. I typically get a vague response that includes “it is part of our brand now” or “now our customers expect it”.

Belts are far less forgiving if you do not perform maintenance to a tee. In addition to the 2x-3x up front cost (note that you can user a slightly shorter belt and have the same amount of actual wash space (unless you prep)) you have a significant increase in maintenance cost. I’ve heard of higher volume sites spending $30k+ a year on a belt easily. I would estimate the equivalent conveyor at around $12k over a 5+ year period at higher volumes
 
I’m sure they are out there but out of the dozen or so operators I’ve spoken to with belts non have really endorsed it. I typically get a vague response that includes “it is part of our brand now” or “now our customers expect it”.

Belts are far less forgiving if you do not perform maintenance to a tee. In addition to the 2x-3x up front cost (note that you can user a slightly shorter belt and have the same amount of actual wash space (unless you prep)) you have a significant increase in maintenance cost. I’ve heard of higher volume sites spending $30k+ a year on a belt easily. I would estimate the equivalent conveyor at around $12k over a 5+ year period at higher volumes
Wow. I guess that makes my decision much easier in that regard then. I'm assuming once they become a necessity, the technology will have improved enough to make it worth the investment. Sounds like we're just not there yet.
 
I’m late to this post Wow you guys are doing awesome numbers!
do you guys have no competition in your area?
 
Wow what a day! How fast is your conveyor? Around here we set them to only 80-100CPH. Also curious if your Datatrax unit is brown in color?
Not long ago I was running 4 locations with Datatrax. . Actually replaced DRB with Datatrax. at some locations when DRB told me they would no longer support the version I had. The main Boxes were all a light Tan (Almost a putty color like all the old computers) in color. One, from the 980's had LED readouts and the others were LCD. Most of the relay boxes were the same color but had to but a few that were white when I replaced the DRBs. Conveyor was 3'6" roller spacing and with cars at about 6 foot pacing there would be one rolling off every 12-15 seconds. A local guy I knew a long time managed a Delta sonic and told me they hit over 200CPH. Thought it was baloney until I went to see it.
 
Back
Top