This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
I notice the plumber should have got rid of some "globe style" valves. Maybe his OCD fell short??? 2Biz would have done better!
The real nitty gritty even more important question is: Did the OCD guy or did his engineer that he depended on calculate & verify all his flows in the best possible optimized ways.
Thanks IB! I take that as a "Compliment"! LOL....This was definitely designed long before PEX! I couldn't imagine how many leaks! Pex manifolds makes these installs so much easier now....I couldn't utilize the pex manifolds since my floor heat was done with old black plastic 5/8" tubing...I had to use barb fittings to plumb the manifold...