I don’t know how you guys can say that the bill was excessive when you don’t know the scope of the project. How many man hours were used on the job? How much material was used? Where there any panels, sub panels, motor starters etc. used? For a contractor to say it’d be about $3000 is absolutely crazy. Did he look at the job, did he do a bid on the job? Probably not. Did the contractor pull a permit for the Job? Did he give you an itemized invoice with every item that was used on the job, we would.
We recently bid a job at $14,500 at a business. The business owner went sideways when he got the bid. He hired another guy to come in and do the job for $10,350, paid him half up front. He got about halfway completed and walk off the job, the owner is a total jerk. The business owner called us and wanted it done. We got the necessary permits, there weren’t any permits. Redid 80% of what the first contractor did because it wasn’t up to code and gave the business owner a bill for $12,750. He would have been better off to hired us in the first place and it would have been done on time and little expensive.