The problem with iba's is that they are slow especially when you factor in the drying time. I have a 41' glass building now and the car waiting can not enter until the car in front has finished drying. It would be much faster if one car could be washing while another car is drying.
I am putting in a second location and was thinking about going to a 49' building and try to move the dryers down so that a second car could start washing while the car in front is drying. But I am not sure if there is enough distance there so that the air from the dryers will not interfer with the presoak going on the next car. This idea would work with a much longer building obviously but my budget has me limited to the 49' building. Has anybody tried this using a 49' building?
I am putting in a second location and was thinking about going to a 49' building and try to move the dryers down so that a second car could start washing while the car in front is drying. But I am not sure if there is enough distance there so that the air from the dryers will not interfer with the presoak going on the next car. This idea would work with a much longer building obviously but my budget has me limited to the 49' building. Has anybody tried this using a 49' building?