I have come to the conclusion that we will likely need to upgrade our incoming 1.5" water main line to a 2" or 2.5". Likely looking at replacing the line from the street, upgrading the tap with the city and running the bigger line into the wash for more volume. We have approximately 100ft from the street main to the water meter in the equipment room. Has anyone had to do this? Just trying to get a really rough idea of what this costs all in?