Want to pick apart a few peoples brain, not from the US.
Situation is as is:
Land value: 2.5-3m
Construction Cost: 1.5m
Equipment Value: 1.1m
If you were going to build a car wash on someone else's land, using the figures above, what would be a reasonable lease if you were to front equipment cost and they fronted construction costs?
Commercial Loan rates are 7%~ ATM.
Situation is as is:
Land value: 2.5-3m
Construction Cost: 1.5m
Equipment Value: 1.1m
If you were going to build a car wash on someone else's land, using the figures above, what would be a reasonable lease if you were to front equipment cost and they fronted construction costs?
Commercial Loan rates are 7%~ ATM.