Adding an additional LP system for bug remover next week on a 4 bay SS, pump room in middle of building. I want to use foam generators, and was planning to include them in the pump room before it runs out to each bay instead of in the trough. I guesstimate it might be a 30 foot run from foam generator to top of the ceiling in the to the bay at the furthest point.
Is that distance too far? Trough is getting full and I'm hoping to avoid having a bulky foam generator up there if I can avoid it.
Is that distance too far? Trough is getting full and I'm hoping to avoid having a bulky foam generator up there if I can avoid it.