My 1" SS schedule 40 pipe is secured to the block with unistrut but the anchors keep vibrating out of the hollow block. I thought about toggle bolts but don't know if that will work either. Wanted to see what everyone else uses or reccomends?
Best way is to get a concrete blade for your saw, cut a trench where you want the pipe, then chip it out. Lay the pipe in with just the nozzles above the floor, and mud it in.