I need to move my vacuum bay. I don't know why anyone would place a vacuum bay at the enterance to the selfserve bays. It blocks traffic when someone is vacuuming and I see customers leave all the time rather than wait. How is a vacuum bay constructed? I know its block layed up, but is there a footer under the block? I live in Ohio so I assume I would dig down to the frost line and start laying block? Is the top just formed up and poured concrete? Any suggestions would be helpful.