Well-known member
I have a 4 bay wash (2 auto/ 2 s/s) that needs all new concrete and floor heat tubing. I have a vendor that says it will be fine to lay new tubing over old concrete, then pour 4 to 5 inches of new concrete over it.
Has anyone ever done it this way ? If yes, what are the results ? Obviously this way is about 55% of the cost of ripping all of it out; then re-pouring. I am concerned if it will hold up without cracking in the future.