Martins
Active member
- Joined
- Oct 10, 2020
- Messages
- 173
- Reaction score
- 99
- Points
- 28
I am soooo pumped we are getting close to finishing the 2nd phase of my rehab of the ole wash i bought. Paint is almost finished up. Most likely done by tomorrow. My ginsan coin boxes were installed in march w/ crypto pay, just bumped the price to $1.50 for 3.5 start time. all new vacuum hoses, motors and timers ($0.75 for 3.5) new Hamilton changer installed in march as well.
next phase is the broken IBA being removed. (Possibly adding a used one)
Air shammies are on order waiting for them to come in for install and im debating raising my start cost to $2 for 4.66 mins once they are installed and working. Thoughts? (Will be the only wash with them) and then trying to get some of the parking lot repaired.
Also going to look at another abandoned wash this week to possibly pick up.
im super pumped with how this is turning out! I just hope the locals do as well. Here is some befores and afters talk about a whole new wash!
next phase is the broken IBA being removed. (Possibly adding a used one)
Air shammies are on order waiting for them to come in for install and im debating raising my start cost to $2 for 4.66 mins once they are installed and working. Thoughts? (Will be the only wash with them) and then trying to get some of the parking lot repaired.
Also going to look at another abandoned wash this week to possibly pick up.
im super pumped with how this is turning out! I just hope the locals do as well. Here is some befores and afters talk about a whole new wash!
Attachments
-
134 KB Views: 50
-
4.4 MB Views: 49
-
2.9 MB Views: 49
-
3.3 MB Views: 45
-
3.4 MB Views: 47
-
2.6 MB Views: 45
-
4.3 MB Views: 44
-
3.7 MB Views: 41
-
4.3 MB Views: 41
-
3.7 MB Views: 40