Greg Pack
Wash Weenie
Finally got these fixtures installed. As Miles suggested we retrofitted into existing MH fixtures using a piece of plywood painted white. They were retrofitted into the existing frames which swings open just like before for servicing. I hope to get the wash open in a couple of weeks. This is a sample view but we still have the vacuum island and area lighting that needs replacing.
Last edited: