Hey there, planning out my roadmap of additions, dryers are after card machines. I have 2/6 bays next to the equipment room where putting in a turbo towel and boom should be a snap. Where might one install on the bays with only 7.5 ft walls? Do I need to bring down a post thru the roof for it? Would like to keep trips to the roof at a minimum overall.
Attachments
-
696.4 KB Views: 17