Oh what a long trip this is going to be.
I think I have landed on Nyax debit card readers after about 8 months of reading on several different options.
Was going to buy the Laurel box to put the reader on and the dixmor timer in. Built this all out on KR and it was about 8K in parts to do 6 bays. But I dont really like the idea of having two seperate boxes out in the bay. Also the laurel box is meant to by mounted via either side, I of course want to mount it from the rear of the box, which means 200 for the box and 30 bucks per side to cover the punch outs. So I am 260 per bay before timer, wiring harness, debit card reader, and labor to install and connect.
That is also before the new wire I need to run to each bay from the equipment room. I recognize current wire is 30 years old. Gotta replace it.
If I go with all new timer boxes with more functions, Debit card reader, bill acceptor, and quarters, its about 3k a bay. Again, before install. I am dirt poor, so maybe 2 bays get new timers and then we see how it goes.....
I think If I run all the wire myself, and buy new boxes, I may just tackle the install myself. (At least as much as I can handle.)
What kind of wire is necessary for this kind of thing ? I am certain the lead times are rediculous so I will probabluy need to get this ordered sooner vs later.
Anybody else out there do this already and have some lessons learned for me ?
I think I have landed on Nyax debit card readers after about 8 months of reading on several different options.
Was going to buy the Laurel box to put the reader on and the dixmor timer in. Built this all out on KR and it was about 8K in parts to do 6 bays. But I dont really like the idea of having two seperate boxes out in the bay. Also the laurel box is meant to by mounted via either side, I of course want to mount it from the rear of the box, which means 200 for the box and 30 bucks per side to cover the punch outs. So I am 260 per bay before timer, wiring harness, debit card reader, and labor to install and connect.
That is also before the new wire I need to run to each bay from the equipment room. I recognize current wire is 30 years old. Gotta replace it.
If I go with all new timer boxes with more functions, Debit card reader, bill acceptor, and quarters, its about 3k a bay. Again, before install. I am dirt poor, so maybe 2 bays get new timers and then we see how it goes.....
I think If I run all the wire myself, and buy new boxes, I may just tackle the install myself. (At least as much as I can handle.)
What kind of wire is necessary for this kind of thing ? I am certain the lead times are rediculous so I will probabluy need to get this ordered sooner vs later.
Anybody else out there do this already and have some lessons learned for me ?