Stumbled on a "Tom's Way" video on Kleen Rite site about plumbing a low pressure system. He's saying to tee the 1/4" poly tubing (air and product) together in the equipment room and run 1/2" Polybraid to the bay, with no foam generator needed. I've always ran 1/4" poly tube to bay and tee...