I have 2 sites a 4/2 and a tunnel. My 4/2 had them already installed and the tunnel was block and I installed the panels. Went faster than I thought it would and looks 100x better. I know from my 4/2 that its easy to clean and looks great when clean.
110' tunnel cost me $6K in panels shipped...