You can simplify the system by eliminating the foam generators and metering valves and improve product delivery with a few changes…
1. Air pressure regulators with gauges feed the
FloJet and the air-assist solenoids
2. Run 1/4" poly tubing from each pair of solenoids
3. Connect the 2 poly tubes to a Tee at a point near the foam brush boom
4. Connect a 3/8” or 1/2” tube/hose from the Tee’s outlet to the boom inlet
5. Set
Flojet air pressure to 40 PSI
6. Set Air Assist pressure to 30 PSI
7. Adjust Air Assist PSI up for dryer foam…down for wetter foam. Adjustments should only be 1 or 2 PSI at a time until satisfied.