With several dozen trough systems installed, these are the only photos in my library.
Equipment room roof penetrations are made with 4" hole saw and electrical nipple, nuts, and bushings.
For bay penetrations, 3/4" PVC conduit slip x MPT adapters, lock nuts and bushings.